Objective
Modernize the existing mechanical and electrical systems and seismically upgrade the existing pump station.
Challenge
Improving the foundation of the new structures with compaction grouting at a fully operation pump station site that was susceptible to seismic-induced liquefaction and settlement.
Result
Reliably deliver drinking water to over 60% of the San Francisco residents.