Owner

San Francisco Public Utilities Commission

Engineer

SFPUC

Objective


Modernize the existing mechanical and electrical systems and seismically upgrade the existing pump station.

Challenge


Improving the foundation of the new structures with compaction grouting at a fully operation pump station site that was susceptible to seismic-induced liquefaction and settlement.

Result


Reliably deliver drinking water to over 60% of the San Francisco residents.