Objectives
Construct a new raw sewage pumping facilities with odor control and electric power supply, additional standby power generation equipment, a pond return pump station, demolition of select existing facilities, and all related and associated work.
Challenge
Significant shoring and escavation was required to excavate for the pump station with an overally dimension of 92′ long X 64′ wide X 25′ deep next to an existing operating headworks faciltiy
Result
Handle all the influent flows to one of two major wastewater treatment plants in Roseville, CA with a new robust, reliable pump station with outstanding odor control to keep the neighbors happy.