Owner

Mission Bell Winery

Engineer

Summit Engineering

Objective


Design and build a water reuse system to reduce the amount of salinity discharged from the main facility process waste stream.

Challenge


Integrating the existing control system with a new modern control strategy.

Result


Meet the regulatory requirements for salinity reduction stipulated by the California Regional Water Quality Control Board Notice of Violation.